News
News archive
15.6.2012
3D Plans

When developing any pump station, TechnoAlpin's design department produces 2D and then 3D plans for it.
These drawings contain all the information needed to build the plant, including the type and positioning of pipes, flanges, and pumps. They are also used to create the bill of materials.
As part of the continuous improvement efforts of the pre-project teams, TechnoAlpin can now provide photorealistic images of the pump station.
TechnoAlpin customers can see their pump station before it is actually built. Sections and viewpoints can be analyzed that are otherwise physically impossible. The customer can plan escape routes and can even plan and visualize where to position the equipment needed to support the station's future expansion.






























































© 2013 -
Indoor Snowsystems
Dust controllers