For the water resources, there is a double goal: the construction of a new water reservoir, in addition to the two already existing in the same sector and the expansion of the adjoining Canillo pumping station, located at an altitude of 2410m. That will allow to optimize the management of water resources for snow production, with 2 new snowmaking pumps of 150m3/h and 200kW, with variable speed drive.
On the slope side, a little over 2700m of cast iron pipes will be laid out and 23 snow pits will be installed, all equipped with the latest generation snow guns, TL8 lances with Smart Distributor. All of the new equipment will be integrated into the Liberty software, which controls the existing installation.